A Plan for the Hood Canal project

Progress is being made in the scrap out & gutting of the mobile interior in preparation for the big move - removing & replacing the roof…

The goal will be to somehow retain the basic structure and to add a visual & practical sliding glass door connection to the extended deck. Also, the current roof is nearly flat and, upon its removal, the new structure will allow for a “cathedral” type ceiling with a far more spacious feel over the entire view side of the mobile.

Revised section with new roof at 3:12 roof pitch